16/30
Smart Infrastructure CC1N7544en
21.05.2021
Connection and internal diagram LMV36 (cont´d)
For shielding the cables on the VSD, refer to:
Siemens SED2 VSD Commissioning Manual (G5192), chapter 4 and chapter 7, or
Danfoss Operation Manual VLT 6000 (MG60A703), chapter Installation
Switching between 2 ratio control curves
External load controller (ON/OFF)
Interal fuel selection 1
“L” for controller control
4
3
2
1