EasyManua.ls Logo

Siemens BT 200 User Manual

Siemens BT 200
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
BT 200 04/00 English
(S)J31069-D0075-U001-A2-6318 Page 1
BT 200
Physical Bus Test Device
for PROFIBUS-DP
Table of Contents
1 DESCRIPTION .............................................. 2
2 COMMISSIONING ......................................... 4
3 NORMAL MODE ........................................... 5
3.1 WIRING TEST ........................................................6
3.2 E
RROR MESSAGES OF THE WIRING TEST.................7
4 SPECIALIST MODE .................................... 10
4.1 OPERATOR CONTROL ..........................................10
4.2 STATION (RS 485) TEST .....................................12
4.3 B
RANCH TEST.....................................................13
4.4 D
ISTANCE...........................................................15
4.5 REFLECTION TEST ...............................................16
4.6 S
ERVICE.............................................................17
5 LOG MODE ................................................. 18
6 SAMPLE APPLICATIONS .......................... 20
7 MAINTENANCE AND TROUBLE-
SHOOTING..................................................... 24
7.1 CHARGING STATUS OF THE BATTERY ....................24
7.2 C
HANGING THE BATTERY .....................................24
7.3 S
ELF-TESTS........................................................25
7.4 ERROR CORRECTION TABLE.................................26
8 ACCESSORIES AND REPLACEMENT
PARTS ............................................................ 27
9 TECHNICAL DATA ..................................... 28

Questions and Answers:

Siemens BT 200 Specifications

General IconGeneral
BrandSiemens
ModelBT 200
CategoryTest Equipment
LanguageEnglish

Summary

1 Description

Purpose of the BT 200

Explains the primary function of the BT 200 device.

BT 200 - version 2 Features

Details additional functions and features of version 2.

2 Commissioning

Scope of Delivery

Lists the items included in the BT 200 package.

Battery Charging Procedure

Instructions on how to charge the BT 200 battery.

3 Normal Mode

Device Startup Displays

Shows initial device startup displays including standby and battery status.

Operational Display and Energy Saving

Details the main screen and automatic power-off feature.

Wiring Test Principles and Operation

Explains the wiring test concept and provides a step-by-step guide.

Wiring Test Error Messages: Types

Details error messages for station tests, wire mix-ups, and short circuits.

Wiring Test Error Messages: Breaks

Covers error messages for broken wires or shield connections.

4 Specialist Mode

Operator Control and Cursor Navigation

Explains device navigation and cursor functionality in specialist mode.

Station (RS 485) Test: Performing and Results

Instructions for conducting the RS 485 test and understanding its results.

Branch Test Procedure

Steps to perform the branch test for bus availability.

Branch Test Results Interpretation

Details the results of the branch test and potential issues.

Distance Measurement: Procedure and Results

Procedure for measuring line distances and interpreting results.

Reflection Test: Operation and Results

Guide to executing the reflection test and interpreting its outcomes.

Service Menu: Settings and Communication

Describes configurable settings and data transmission activation.

Service Menu: Display Info and Hardware Tests

Details information shown and the internal hardware testing.

Service Menu: Calibration Procedure

Explains the process and necessity of calibration for measurements.

5 Log Mode

Storing and Managing Test Data

Instructions on how to save and manage performed tests with identifiers.

Memory Full and PC Data Transfer

Handles full memory scenarios and transferring data to a PC.

Deleting Stored Test Data

Explains how to erase stored test data from the device.

6 Sample Applications

Testing Complete PROFIBUS-DP System

Demonstrates testing the entire PROFIBUS-DP system without the master.

Wiring Test for Connected Stations

Shows how to perform wiring tests on connected stations without removal.

Wiring Test via Repeater PG Socket

Illustrates wiring tests using a repeater's PG socket.

Wiring Test Behind Repeater with Terminator

Demonstrates testing a segment with a repeater and terminator.

7 Maintenance and Troubleshooting

Battery Status and Replacement

Covers checking battery charge and instructions for battery replacement.

Types of Self-Tests Performed

Details the internal RS 485, RAM, and Flash EPROM diagnostic tests.

Startup Faults and Correction Methods

Lists errors occurring during startup and their corresponding solutions.

Operation Faults and Correction Methods

Details errors occurring during operation and their correction methods.

8 Accessories and Replacement Parts

Ordering Test Connectors and Log Kits

Information on ordering test connectors and the log kit.

Ordering Chargers and Batteries

Details for ordering replacement chargers and batteries.

Ordering Test Cables

Information on ordering specific test cables for station testing.

9 Technical Data

General and Environmental Specifications

Provides general device specs, environmental requirements, and EMC guidelines.

Physical Requirements and Certifications

Outlines physical requirements, vibration/shock, and device certifications.

Related product manuals