EasyManua.ls Logo

Siemens FC2025 - Standards and Directives Complied; FCC Statement

Siemens FC2025
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
Siemens Industry, Inc. A6V10337045_en--_n
Smart Infrastructure
Figure 5: Module Location for 2HU Enclosure (Remote Station) and Recommend Wire Routing
Recommended Wiring Routes:
Any knockouts may be used for the power-limited wiring
associated with the 2HU - Remote Station.
Module
Locations
FHB2002
-
U2/R2:
1. FCM2018-U2 / FCM2019-U2
2. FCA2015-U1 (optional)
3. FTI2001-U1
4. VTA2001-A1
5. FN2012-A1 with VN2001-A1 / VN2002-A1 /
VN2003-A1
6. VTO2004-U2/U3
7. VTO2002-U2/U3
Notes:
As indicated in Figure 5, FTI2001-U1 and VTA2001-A1 are
stacked on top of one another using the standoff provided with
VTA2001-A1. The image is displayed flat to show the wiring
details.
1
2
3
4
5
6
777
To FV2025 / FV 2050
24 VDC
Low Level
Audio
CAN Bus
Internal Wiring
External Wiring

Other manuals for Siemens FC2025

Related product manuals