EasyManua.ls Logo

Siemens SCALANCE W746-1PRO - 5.4 Fitting the IE FC TP standard cable 4 x 2 GP to an IE IP 67 hybrid connector

Siemens SCALANCE W746-1PRO
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connecting up
5.4 Fitting the IE FC TP standard cable 4 x 2 GP to an IE IP 67 hybrid connector
SCALANCE W788-xPRO/RR / W74x-1PRO/RR
30 Operating Instructions, 07/2014, A5E02280448-08
5.4
Fitting the IE FC TP standard cable 4 x 2 GP to an IE IP 67 hybrid
connector
Procedure
Push the hexagonal nut, the sealing sleeve and the
housing over the cable jacket in the order shown.
Remove the following lengths of cable jacket and shield
braid:
25 mm for the power leads
30 mm for the data leads
To achieve good shielding, the shield braid must be alt
least 30 mm long.
Arrange the data leads according to the color codes on
the splice element. The following table shows the
assignment of the data leads.
Wind the shield braid around the data leads. As a result,
the shielding of the cable has contact to the shield plate
of the splice element that will be fitted later.
Contact and color assignment of the splice element.

Other manuals for Siemens SCALANCE W746-1PRO

Related product manuals