EasyManua.ls Logo

Siemens SINAMICS S120 - Page 24

Siemens SINAMICS S120
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Equipotential Bonding
© Siemens AG, 2004. All rights reserved
4-24 EMC Installation Guideline – Planning Guide (EMV) – 03.2004 Edition
Grouping:
With an insulated component structure or when connecting equipotential bonding
lines of cabinet external components, the equipotential bonding lines must be
arranged separately from the power components and signal-sensitive components.
The equipotential bonding lines must be arranged in groups.
components
Signal-circuit
Power
components
NC
Interface control
PLC
Control electronics
of drive control
0 V cable from ext.
power pack
Relay adapters
Actual-value encoder
Equipotential
bonding strip
XXX
XXX
Earthing bar
= Large-area, conductive connection
to earthed housing
XXX
Fig. 4-3 Arrangement of equipotential bonding lines in groups

Other manuals for Siemens SINAMICS S120

Related product manuals