EasyManuals Logo

SIMONINI Victor 2 Super User Manual

Default Icon
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
ANNEX
DECLARATION OF QUALITY
With the present we declare that the engines that we sell are submitted to strictly controls. Every
part is singularly checked, then assembled then re-checked after the installation following the
industrial concepts of construction.
In particular:
1. Each engine is manufactured according to design.
Each engine is assembled at the factory and run for 4 hours at the factory.
2. The engine run is done with the following parameters checked:
RPM
CHT
EGT
Water Temperature
Engines are checked for leaks of exhaust gases, coolant liquids or fuel /oil mixtures.
After engine run is completed, all components are visually checked for leaks.
After engine is cooled down to ambient temperature, all cylinders head bolts, gearbox bolts,
spark plugs, water-temp belt are checked for the respect of the correct torque and tension
curve parameters.
All exhausts arc checked for possible cracks.
Final inspection is done by testing engineers before engine is dispatched to the customer.
3. All exhausts are manufactured on jigs in the factory (avoiding differences between them).
4. All exhausts are made of mild steel using MIG welding.
Each exhaust is checked by quality control manager at Simonini factory before it leaves the
factory.
SIMONINI RACING SRL
Via Per Marano 4303, Loc. San Dalmazio - 41028 Serramazzoni (Mo)
Tel. 0536/953005 Fax. 0536/953006.
Http : www.Simonini-flying.com E-mail : info@simonini-flying.com

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SIMONINI Victor 2 Super and is the answer not in the manual?

SIMONINI Victor 2 Super Specifications

General IconGeneral
BrandSIMONINI
ModelVictor 2 Super
CategoryEngine
LanguageEnglish

Related product manuals