EasyManua.ls Logo

Sinclair KJR-120A - 5 Installation Procedure

Sinclair KJR-120A
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
5. INSTALLATION PROCEDURE
Installation procedure:
NOTE
Outdoor unit
#00
Outdoor unit
#01
Outdoor unit
#02
Outdoor unit
#15
Wire Controller
#00
Use PQE connect with the outdoor units.
Please connect the attached shorted-wires to the corresponding communi-
cation port COM(I) or COM(O) in the main control board of the last parallel
unit (dial code ). Directly connect to the last parallel unit if only one unit is
connected.

Related product manuals