EasyManuals Logo

Sinclair SDV5 Series Service Manual

Sinclair SDV5 Series
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
14 201806
Caution
All installation, servicing and maintenance must be carried out by competent and suitably qualified, certified
and accredited professionals and in accordance with all applicable legislation.
Units should be grounded in accordance with all applicable legislation. Metal and other conductive components
should be insulated in accordance with all applicable legislation.
Power supply wiring should be securely fastened at the power supply terminals loose power supply wiring
would represent a fire risk.
After installation, servicing or maintenance, the electric control box cover should be closed. Failing to close the
electric control box cover risks fire or electric shock.
Switch ENC1 (indoor unit capacity setting) is factory-set and its setting should normally not be changed. The
only circumstances in which a switch ENC1 might need to be set in the field is when replacing a main PCB.
When replacing a main PCB, ensure that the capacity setting on switch ENC1 on the new PCB is consistent with
the unit capacity given on the unit’s nameplate.
Notes for installers and service engineers

Other manuals for Sinclair SDV5 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sinclair SDV5 Series and is the answer not in the manual?

Sinclair SDV5 Series Specifications

General IconGeneral
BrandSinclair
ModelSDV5 Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals