EasyManua.ls Logo

Slackers Skate Swing - Maintenance and Care; Seasonal and Regular Checks; Loose-Fill Material Depth

Slackers Skate Swing
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
4/23/18
/2018
b4 Adventure 4010 Holly Street Unit 16 Denver Colorado 80216 1-844-834-4334
QUESTIONS? info@b4Adventure.com · www.slackersline.com/help-center/ 303-339-0482
Product #- SLA.823
Age Range- 5- 99yrs
Weight Limit- 250lbs (113kg)
Max 2 people
The use zone to the front and to the rear of swings shall be a minimum distance of 2X on a line extending 90⁰ both front and rear from the
longitudinal direction of the suspending beam, where X equals the vertical distance from the top of the protective surfacing to the pivot
point of the swing. The total horizontal distance from the front to the rear of the use zone shall be ≥ 4X (Greater than 4 times the distance
from the ground to the attachment at the top) front and back
If worn or damaged parts are found, contact b4Adventure for replacement parts - Do not substitute with other, non-b4 Adventure parts or failure
resulting in injury could result.
MAINTENANCE OF YOUR SWING
At the beginning of each play season:
• Tighten all hardware.
• Check all protective coverings on bolts, pipes, edges and corners. Replace if they are loose, cracked or missing.
• Check all metal parts for rust. If found, sand and repaint using a non-lead based paint meeting the requirements of 16CFR 1303. Lubricate all metallic
moving parts per manufacturer’s instructions
• Check all moving parts including disks, ropes, cables, and chains for wear, rust, or other deterioration. Replace as needed.
• Check the rope and disks for deterioration, cracking or fraying. If found, DO NOT USE and dispose of
immediately.
• X.3.1.1 Loose-Fill Materials:
X.3.1.1 Maintain a minimum depth of 9 inches of loose-fill materials such as wood mulch/chips, engineered wood fiber (EWF), or shredded/recycled rubber
mulch for equipment up to 8 feet high; and 9- inches of sand or pea gravel for equipment up to 5 feet high. NOTE: An initial fill level of 12 inches will compress
to about a 9 inches depth of surfacing over time. The surfacing will also compact, displace and settle, and should be periodically refilled to maintain at least a
9inch depth
-

Related product manuals