SMA Solar Technology AG 3 Inverter Manager
Installation Manual IMVIOBOX-IA-xx-16 9
Connecting the Power Supply Unit
SMA recommends using the top-hat rail power supply
available as an accessory (order number:
CLCON-PWRSUPPLY)* .
Procedure:
1. Mount the power supply unit (see the manufacturer
manual).
2. Connect the connection cable to the power supply unit
(see the manufacturer manual). Trim the unused
insulated conductors up to the cable sheath and write
down the conductor colors.
3. Connect the connection cable to the terminal block for
the voltage supply (9 VDC to 36 VDC). Make sure that
the shielded grounding conductor is connected with the
grounding terminal.
4. Plug the terminal block for the voltage supply with
connected power supply unit in the pin connector
"Power Input" of the Inverter Manager.
5. Connect the AC connection cable to the power supply
unit (see the manufacturer manual).
7. Connect the other end of the AC connection cable to
the voltage supply.
8. Connect the connection point to the utility grid.
Once the Power LED is glowing green, the
Inverter Manager is ready for operation.
3.4 Ethernet Connection of the
Inverter Manager
LAN 1 (system network)
The IP address and the subnet mask are assigned to the
LAN 1 port of the Inverter Manager by an external DHCP
server.
An IP address can be manually assigned to LAN 1 Port of
the Inverter Manager.
LAN 2 (inverter network)
The IP address is assigned to the inverter by the Inverter
Manager.
Resetting the Inverter Manager to DHCP
Press the power button three times in succession within
one second to reset the Inverter Manager to DHCP.
3.5 LED Signals of the
Inverter Manager
* Not available in all countries.
6.
Danger to life due to electric shock
Lethal voltages are present at the connection point of
the utility grid.
Disconnect the connection point from voltage
sources and make sure it cannot be
reconnected.
GND
9 to 36 VDC
LED State Explanation
Power Glowing
green
The Inverter Manager is in
operation.
Off The Inverter Manager is not
in operation.
LAN Glowing
green
100 Mbps Ethernet mode
Glowing
yellow
1000 Mbps (gigabyte)
Ethernet mode
Off No activity or
10 Mbps Ethernet
Tx1, Tx2
(P1-P2)
Flashing
green
Data transmission via serial
ports P1-P2
Off No data transmission via
serial ports P1-P2
Rx1, Rx2
(P1-P2)
Flashing
green
Data reception via serial
ports P1-P2
Off No data reception via serial
ports P1-P2