SMA Solar Technology AG 6 Electrical Connection
Operating Manual MC-BOX-6_12-BE-en-20 21
6.1.2 Bottom View of the Multicluster Box 6.3
FTerminals X2 Loads for connecting the loads (N, grounding conductor)
GTerminals X3 PV-System for connecting the PV system (L1, L2, L3, N, grounding
conductor)
H Circuit breaker for connecting the Sunny Island inverters (L)
ITerminals X4 All Clusters for connecting the Sunny Island inverters
(N, grounding conductor)
JTerminal X5 Equipotential Busbar for connecting the grounding conductor
(for grounding the entire multicluster system)
Object Description
A Flange plate with membranes for inserting the connection cables
B Two-part cable feed-through for inserting the data cables
Object Description