EasyManua.ls Logo

SMA Multicluster Box 6.3 - Page 32

SMA Multicluster Box 6.3
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Electrical Connection SMA Solar Technology AG
32 MC-BOX-6_12-BE-en-20 Operating Manual
4. Loosen the screws of the two-part cable
feed-through.
5. Remove the half without the T-shaped fastening
pieces.
6. Lay the data cable for communication and the data
cable for control and measuring signals of sufficient
length from the cable feed-through with the
T-shaped mounting tab to the desired connection
point and secure it with cable ties.
7. Bolt the halves back together. Fasten the screws
hand-tight.
The data cables and placeholders (plastic stick)
must be firmly pressed between both sides of the
two-part cable feed-through. This ensures tightness
of the enclosure.
8. Position the cable feed-through including the cable
from the outside in the enclosure.
9. Position the mounting plate of the two-part cable
feed-through and fasten it hand-tight.
10. Repeat steps 1 to 9 for the remaining data cables.
Use the second two-part cable feed-through.

Related product manuals