EasyManua.ls Logo

SMA STP 110-60 - Page 32

SMA STP 110-60
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Mounting
SMA Solar Technology AG
Operating manualSTP110-60-BE-en-1632
8. Hook the inverter into the mounting bracket.
9. Remove all 4 carrying handles from the threaded holes or remove the eye bolts of the lifting
gear and once again screw in the sealing screws (flat-blade screwdriver 4mm, tightening
torque: 2Nm).
10. Use the pan head screws (M5x65) to attach the
inverter to the mounting bracket (PH3, tightening
torque: 4.5Nm).
2x2x2x

Table of Contents

Other manuals for SMA STP 110-60

Related product manuals