EasyManua.ls Logo

Smeg FQ55UFX - Installing the Water Line

Smeg FQ55UFX
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
4.5 Installing the Water Line
Installing the water line
Water line installation kits are available as an additional accessory
from your dealer or at a local hardware store.
Connection to the water supply line
1. First, shut off the main water supply line and turn the icemaker
off.
2. Located the nearest cold water supply valve.
3. After connecting the water supply to the water valve, turn your
main water supply back on and flush several gallons of water to
clear the water supply line.
Connecting the water line to the refrigerator
There are several items that you need to purchase to complete this
connection.
You will find these items sold as a kit at your local hardware store.
1. First water tubes (supplied) insert into corresponding hole of
water connector (supplied).
2. Next, water line installation kit (not included) inserts into
another hole of water connector (supplied).
3. Turn water valve on and check for any leakage.
Connecting the water line to a drinkable water source
If your water line is NOT drinkable please add an external water
filter.
If you must repair or disassemble the water line, cut off the plastic
tubing to make sure you get a snug, leak-free connection.
Water line installation kit
Water connector
Water tube
Cold water line
Tube clamp
Shut-off valve
The minimum inlet water pressure147kPa
The maximum inlet water pressure834kPa

Related product manuals