19
Featuring Celios Advanced Air Purification Technology
Dock the Core in the Main Stand
1. Plug the Power Adapter into the Main Stand
and then to a powered electrical outlet.
2. Slide the Core into the Main Stand.
The control panel on the Core will be facing
the same side as the Remote.
3. When you correctly dock the Core in the Main
Stand, the unit will beep (whether you have AC
power or not). If the Core is not properly installed,
it will not beep and will not sit properly within the
Main Stand.
You may remove the tape straps from the air
intake vents.
A000849-11_Rev C-SCAP IFU_7.5x5_NO 2400_011221.indd 19A000849-11_Rev C-SCAP IFU_7.5x5_NO 2400_011221.indd 19 1/12/21 10:09 AM1/12/21 10:09 AM