EasyManua.ls Logo

Softub T140 - Monitor for Leaks and Install Covers; Adjust Water Chemistry and Air Control

Softub T140
9 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Check for leaks while the tub
is running. If there are leaks,
tighten the connectors. Now
install the foam and vinyl
connector covers.
!
!
15 min.
LIGHT
JETS
HEAT
FILTER
ON
LIGHT
JETS
HEAT
FILTER
OFF
With the tub running check the chemical levels and adjust them as necessary as advised in
the Water Care Guide. Open the air control on the control panel by rotating counter-clock-
wise for 15 minutes after adding the chemicals. After 15 minutes, close the air control by
rotating it counter-clockwise until it stops and put the lid on the tub.
!
11

Related product manuals