EasyManua.ls Logo

Softub T300 - User Manual

Default Icon
9 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
ASSEMBLY INSTRUCTIONS
T140 / T220/ T300
www.softub.com
Question and Answer IconNeed help?

Do you have a question about the Softub T300 and is the answer not in the manual?

Summary

Softub Assembly Instructions

Unboxing and Initial Setup

Safely open the Softub box using a hammer claw, not a razor knife, to begin assembly.

Component Identification and Cover Strap Preparation

Identify all included items and position cover straps in an "X" pattern for proper attachment.

Power Unit Connection and Strap Verification

Verify strap placement and connect the power unit to the tub, ensuring snug, thread-free connections.

Hose Flushing and Initial Water Filling

Flush the hose before filling the tub. Smooth liner wrinkles once water reaches approximately 2 inches.

Filter Installation, Final Filling, and Leak Checks

Install the filter, fill the tub 2 inches above the highest jet, and check for leaks before plugging in.

Operational Checks and Water Chemistry

Perform final leak checks, install covers, check chemical levels, and operate the air control.

Setting Temperature and Locking Cover

Set the desired water temperature and secure the cover; the tub heats at 1-1.5 degrees per hour.

Softub T300 Specifications

General IconGeneral
BrandSoftub
ModelT300
CategoryHot Tub
LanguageEnglish

Related product manuals