Solamiser User Manual
l) Check the utility company's energy meter and
observe the rate of energy flow. This should be
close to zero with a small amount of export energy
about -150W.
m) If you are installing after dark there is no solar
energy available so you would expect the LED to
flash once per second (on for half a second then
off for half a second) indicating energy import. If it
flashes once every 2 seconds then the current
clamp should be reversed.
n) Solamiser is now correctly commissioned.
18