EasyManua.ls Logo

Solfex IRC 2.1 - Page 11

Solfex IRC 2.1
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 10 of 24
Installation instructions
Wooden frame collectors
In
-
roof installation
(19)
Place the linings, mounds the junctions and
secure using a hex spanner.
Do NOT fasten too strongly. This might damage
the collector’s connections.
(20)
Make the group’s inlet and outlet connections run
through the attic space by means of clamping ring
bends.
If the collectors are being connected using Pre-insulated flexible pipe work, it is advisable to
fix the pipe work in position first using suitable brackets or strap band before making final joint
connection of the solar collectors, this will prevent the joint being disturbed at a later stage
causing leakage of solar fluid.
ALWAYS CHECK CONNECTION JOINTS FOR TIGHTNESS PRIOR TO
FIXING FLASHING KIT!
Installing the collectors - page 11
Technical changes may be made without notice