Use the following illustrations and pictures as
for attaching the rails to the structure:
CONNECT TWO RB RAILS
B
Step 4: Rotate one rail arm on C-2, D-1, D-2, E-2. G-2, H-1, and I-1 I to match the red arrows shown above. The arm number
is shown above and is counted from the bottom up. Example: E-3 is the 3rd arm from bottom on the E shaft.
Step 5: Connect two R-B rails starting at the bottom ring on the elevator shaft and going left, connect at G-1, G-2, E-1, F-1,
H-1, I-1, G-2, E-2, B-1, A-1. Space loop begins at C-2 and should be 80 mm in diameter to C-1, at D-2 it shrinks to 70 mm in
diameter (see page 14 loop instructions) through D-1. After loop continue to E-3, G-6 and then connecting the end into
the back side of the Rail Splitter. There will be extra rail at the end. Leave extra rail until the end of Step 3.
Step 6: Starting at the elevator shaft, straighten rails and place a Rail Clip in between each Shaft to keep rails evenly
spaced as shown by the red triangles above. Go from section to section until you end at the Rail Splitter. After making
sure the rails look correct, cut excess rail using scissors. Refer to photo above for how the nal cuts should look.
TWO RB rails are used. (270 cm each)
D-2
D-1 E-3 E-2 E-1
C-2
A-1
B-1
C-1
F-1
H-1
I-1
G-6 G-2 G-1
Bottom
Elevator Ring
C-2
C-1
D-2
D-1
= Rail Clip