EasyManua.ls Logo

Spacerails Level 8 - Installing Rail Section 6; Figure 8 Loop Construction; Final Rail Adjustments and Tuning

Spacerails Level 8
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Seaich Corporation, LLC. All rights reserved. www.seaich.com
|
Spacerails, LLC. www.spacerails.com Page 19
Rail Section 6:
Step1: Start by attaching rail I (365 cm) to the inside
Rail Clip of second splitter facing the front of the base.
Connect rail through arms G-5 and arm M-5. Pass rail
through horizontal loop section and attach arm N-1 and
then arm H-4.
Step2: Pass rail I between shaft D and shaft E and attach
to arm E-8. To create the Figure 8 section the arms on
shaft D and shaft E will need to be rotated around the
shaft. Continue creating the gure 8 section with arms
G-4, E-7, C-2, D-2, E-6, G-3, E-5, C-1, and E-3. Finish by
passing through arm B-1 and into the Rail Clip on the
bottom Elevator Ring facing the front of the base.
Step3: Repeat Step 1 and Step 2 for the outer rail. Attach
Rail Clips to keep rails consistently spaced, supported,
and create a banked corners as needed.
NOTE:
Congratulations on completing Spacerails Level 8! Fine
tune the rails and see how many marbles you can get
going at the same time. If the marbles are coming into
the elevator too quickly it may knock other marbles
already in the tower out. Create a dip or nd other ways
to slow marbles to just the right speed at entrance.

Related product manuals