EasyManua.ls Logo

Spar SP-200A - Control Panel Overview; INSTALLATION

Default Icon
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
A)
Bowl
B) Removable Bowl Guard
C) Planetary Shaft
D) Attachment Hub*
E) Control Panel
F) Gear Lever
G) Additions Chute
H) Bowl Lift Handle
(Wheel)
I) Bowl Cradle
NOTE: Attachment Hub is optional.
Control Panel
A) Emergency Stop
B) Start
C) Timer**
NOTE: Timer is optional on Model SP-100A, SP-100A/nh,
SP-200A and SP-200A/nh.
D) Bowl Raise Button
E) Bowl Lower Button
(Available for SP-A80HI and
SP-A80I Only)
NOTE: Oil Meter Indicator is only available for SP-A80HI, SP-A80I, SP-B80HI and SP-B80I.
INSTALLATION
- The machine is supplied factory lubricated and ready to run. It should be positioned on any solid,
level and non-skid work surface that is nonflammable. Install in work area with adequate light and
space.
- For Smaller Capacity Model, you may place the mixer on bench which
is capable of supporting a load of mixers weight. For safety, the mixer
Installation Instructions
Model SP-60HA

Related product manuals