EasyManua.ls Logo

SPEX 6750 - User Manual

Default Icon
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
6750
FREEZER/MILL
®
OPERATING MANUAL
(Serial Number 05000 and Higher)
Question and Answer IconNeed help?

Do you have a question about the SPEX 6750 and is the answer not in the manual?

Summary

Description

Specifications

Setting Up

Power Switch and Control Panel

Explains the location and function of the power switch and the control panel display.

Lid and Coil Assembly

Details the lid, its hinge, the coil housing, and the mechanism for holding vials.

Keypad and Display

Keypad Functions by Key

Describes the function of each individual key on the keypad for controlling the mill.

Control Modes and Conditions

Liquid Nitrogen Fault Condition

Explains errors when liquid nitrogen levels are insufficient for operation.

Programming

T1: Grinding Time

Sets the duration for each grinding period within a cycle.

Operation

Adding Liquid Nitrogen Coolant

Details how to add liquid nitrogen and its consumption rate.

Filling the Tub with Liquid Nitrogen

Provides step-by-step instructions for filling the mill's tub with liquid nitrogen.

Loading the Vial

Explains the procedure for assembling and loading sample vials into the mill.

Running the 6750 Freezer;Mill

Details the sequence of operations when starting a grinding cycle.

Removing, Emptying, and Cleaning the Grinding Vial

Describes how to safely remove, empty, and clean used grinding vials.

Parts List & Item Locator

Trouble-Shooting Guide

Summary

Description

Specifications

Setting Up

Power Switch and Control Panel

Explains the location and function of the power switch and the control panel display.

Lid and Coil Assembly

Details the lid, its hinge, the coil housing, and the mechanism for holding vials.

Keypad and Display

Keypad Functions by Key

Describes the function of each individual key on the keypad for controlling the mill.

Control Modes and Conditions

Liquid Nitrogen Fault Condition

Explains errors when liquid nitrogen levels are insufficient for operation.

Programming

T1: Grinding Time

Sets the duration for each grinding period within a cycle.

Operation

Adding Liquid Nitrogen Coolant

Details how to add liquid nitrogen and its consumption rate.

Filling the Tub with Liquid Nitrogen

Provides step-by-step instructions for filling the mill's tub with liquid nitrogen.

Loading the Vial

Explains the procedure for assembling and loading sample vials into the mill.

Running the 6750 Freezer;Mill

Details the sequence of operations when starting a grinding cycle.

Removing, Emptying, and Cleaning the Grinding Vial

Describes how to safely remove, empty, and clean used grinding vials.

Parts List & Item Locator

Trouble-Shooting Guide

SPEX 6750 Specifications

General IconGeneral
BrandSPEX
Model6750
CategoryFreezer
LanguageEnglish