EasyManua.ls Logo

SPM Karma - Page 32

SPM Karma
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Date of issue: January 2018 Revision 1 Page 32/48
- Once the product has reached the desired
consistency the LED will stop flashing and the
rotation of the beater will stop.
- In the first production phase, at this point it is
necessary to open the air regulation pipe and
adjusting it to the desired level.
- Lifting and turning the upper part of the tube
counter clockwise (fig. 10), and positioning the
pin on the notches which become gradually
higher, increases the amount of mix that can
flow into the freezing chamber so changing the
consistency and the bulk of the same.
- To dispense, place a glass under the tap and
pull the lever as shown in fig. 11. The beater
will begin to rotate again, starting the
dispensing phase.
- When the product level LED D (fig. 12) is lit, it
means that the product level in the top tank is
low and should be refilled; in these conditions
the appliance is forced to work at the minimum
level of consistency until the product level has
been restored.
!ATTENTION!
Failure to restore the product level can cause
serious damage to the appliance.
Fig. 10
Fig. 11
Fig. 12

Related product manuals