4 | INSTALLATION, OPERATION and MAINTENANCE MANUAL
1. INTRODUCTION
These operating instructions must be read and thoroughly understood for the
safe commissioning, operation, and maintenance of the APV brand Gasketed
Plate Heat Exchanger. The following procedures must be performed by qualified,
trained personnel who are familiar with this equipment. While every attempt has
been made to ensure clarity, the intent of this document is to provide basic
guidance and it is the responsibility of the end user to review each application
thoroughly for suitable usage. Users should utilize sound engineering judgment
prior to, and during, product operation. Failure to comply may result in damage,
injury, or death.
This manual is specific to industrial and sanitary tie bar tightened frames.
Separate publications address Plate Heat Exchangers tightened by other means.