EasyManua.ls Logo

STIEBEL ELTRON PEO 18/21/24 - Page 8

STIEBEL ELTRON PEO 18/21/24
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Installation
8 | PEO 18/21/24 | PEO 27 www.stiebel-eltron.com
Preparing the power cable
160
≥ 30
26�02�02�0887
Fitting the wall mounting bracket
26�02�02�0972
Mark out the holes for drilling using the installation tem-
plate. If the appliance is to be installed with water connec-
tions on finished walls, also mark out the fixing holes in the
lower part of the template.
Drill the holes and secure the wall mounting bracket with
2screws and 2rawl plugs (screws and rawl plugs are not
part of the standard delivery).
Fit the threaded stud provided.
Fit the wall mounting bracket.
Fitting the cable grommet
26�02�02�0950
Fit the cable grommet. For connecting cables >6mm², en-
large the hole in the cable grommet.
Making the water connection
!
Material losses
Carry out all water connection and installation work in
accordance with regulations.
26�02�02�0948
Seal and insert the twin connectors.
!
Material losses
Never use the shut-off valve in the cold water inlet to
reduce the flow rate.
Preparing the back panel
!
Material losses
If you break open the wrong knock-out in the back panel
by mistake, you must use a new back panel.
L
L
L
D0000041893
Break out the cable grommet knock-out in the back panel.
Deburr any sharp edges with a file if necessary.

Table of Contents

Related product manuals