EasyManua.ls Logo

STIEBEL ELTRON WWK 300 - 3 Installation for Contractors; Transport; Positioning

STIEBEL ELTRON WWK 300
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
3. INSTALLATION for contractors
3.1 Transport
To protect the equipment against damage, it must be transported vertically inside its dedicated
packaging. Where space is restricted, you may move the equipment tipped backwards at an angle.
3.2 Positioning
1. Remove the four screws from the non-returnable
pallet.
2. Remove the washers.
3. Before removing the equipment from the pallet, remove
the anti-vibration mounts from the pack supplied with
the equipment and fully insert them at the base of the
equipment.
4. Remove the equipment from its pallet and position it
where required.
5. Level the equipment by manipulating the anti-vibration
mounts.
Checking installation conditions
The room where the WWK 300 is to be installed must meet
the following conditions:
The unit must be installed Indoors or protected from
the elements ( R ain, etc )
Stable floor ( W WK 300 wet weight is approx.
455kg ) .
Never operate the WWK 300 in rooms at risk from
explosion due to dust, gases or vapours.
Include in your considerations the utilisation of waste
heat if possible, for example, from a boiler, tumble drier or refrigerator/freezer.
The available floor area in the installation room must be at least 6m
2
. Never install this equip-
ment in rooms with a volume of less than 13m
3
.
Never restrict the surroundings of the WWK 300 through walls or ceilings closer than shown in
Fig.4.
The room temperature must never fall below +6
o
C, as the ambient temperature will be reduced
by approx. 1°-3°
C from heat pump operation. The initial temperature level will be re-
established approx. 1/2 hour after the heat pump has been switched OFF.

Related product manuals