EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 160

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operations Model 6DS-SP Planarizer
3 - 52 Version 4.0 - February 1998
1 - POWER UP
Following the steps found in the Basic Operation section of this chapter,
above, power up the machine.
2 - PERFORM HOME SEQUENCE ROUTINE
Following the steps found in the Basic Operation section of this chapter,
above, home the machine.
3 - PLACE CARRIERS ON SPINDLES
Following the steps found in the Basic Operation section of this chapter,
above, place carriers on spindles.
4 - RETRIEVE A STORED RECIPE
Following the steps found in the Basic Operation section of this
chapter, above, retrieve a stored recipe.

Related product manuals