EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 176

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operations Model 6DS-SP Planarizer
3 - 68 Version 4.0 - February 1998
Install a new template ring on each carrier:
9. Lay a new template ring on the carrier lip.
10. Replace the clamp ring.
11. Replace the eight 10-32 clamp screws, rotating them clockwise
to snug.
12. Using a torque screwdriver, tighten each of the eight clamp
screws to 80 oz-in, tightening in a diametrically opposite
sequence:
a. Tighten one screw.
b. Move to the opposite side of the carrier and tighten one
screw.
c. Repeat Steps a. and b. until all eight screws have been
torqued.

Related product manuals