Operations Model 6DS-SP Planarizer
3 - 90 Version 4.0 - February 1998
13. Lift the carrier out of the machine.
14. To unload a second carrier, repeat Steps 10., 11., 12., and
13., immediately above.
15. Remove the fixture.
Note: To avoid damage to the machine, always
remove the fixture before beginning any other
procedure.
16. Close all doors to the machine.