EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 198

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operations Model 6DS-SP Planarizer
3 - 90 Version 4.0 - February 1998
13. Lift the carrier out of the machine.
14. To unload a second carrier, repeat Steps 10., 11., 12., and
13., immediately above.
15. Remove the fixture.
Note: To avoid damage to the machine, always
remove the fixture before beginning any other
procedure.
16. Close all doors to the machine.

Related product manuals