EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 495

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Strasbaugh Preventive Maintenance Schedules
Version 4.0 - February 1998 8 - 5
DAILY PREVENTIVE
MAINTENANCE SCHEDULE
SUBJECT ACTION
Slurry Lines, Slurry System
Wafer Backing Insert
Wafer Template Ring
Operate Slurry Flush Cycle once each
shift.
Flush lines before every pad change,
before the machine is to sit idle for more
than 30 minutes, and after the machine
has been sitting idle for more than 30
minutes.
Inspect and change each shift.
Inspect and change each shift.

Related product manuals