EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 570

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Model 6DS-SP Planarizer
9 - 62 Version 4.0 - February 1998
Notes:
Procedures A and B, Robot Leveling and Robot Belt Tensioning, are new
with Update 1/31/96 to the 6DS-SP Maintenance manual.
As procedures are grouped by component in each chapter, you will need to
move back and forth between the elevator and robot sections to perform the
adjustments in the order required.
THROUGHPUT OPTION - If the throughput option is installed in your
machine, refer to the Front to Back or Side to Side Throughput Option
Addendum to the 6DS-SP Maintenance manual for the software selections
and maintenance adjustments required for operation.
ELEVATORS AND ROBOT
ELEVATOR CASSETTE PLATFORM
LEVELING
[#1 IN ELEVATORS AND ROBOT ADJUSTMENT SERIES]
LEFT SEND ELEVATOR
A. BEFORE YOU BEGIN
Tools Required
5/32-in. hex key
precision scale (accurate to .03125 in.)
test wafer
test cassette

Related product manuals