EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 741

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Model 6DS-SP Planarizer
10 - 50 Version 4.0 - February 1998
A. BEFORE YOU BEGIN
Tools Required
Strasbaugh Load Cell Carrier Kit
Sensotec Portable Indicator
5/32-in. hex key
small flat blade screwdriver
60-LB pressure gauge with 2 four-inch pieces of hose and a
T fitting attached
scale capable of weighing approx. five-pound object (such as a postage scale)
Turn Machine Power On and Perform Home Sequence Routine
Follow the procedures detailed in the Operator Functions chapter of the 6DS-SP
Operations manual.
Install a Polishing Pad on the Table
Follow the procedures detailed in the Operator Functions chapter of the 6DS-SP
Operations manual.
B. PERFORM THE E - P CALIBRATION
1. At the Diagnostics Menu, select Change Counter and enter 57 to choose
Pad Conditioning Control.
2. Enter 0 to change Pad Conditioning Control to 0.
3. Open the right side electrical cabinet service doors.
4. Locate the Fairchild E-P regulator, mounted at the right rear of the
machine (as you are facing the rear of the machine).
Refer to engineering drawing #217946EM, in the Appendices of the
6DS-SP Maintenance manual.
5. Find and disconnect tube # 96:
a. Locate the tube extending from the regulator labeled # 96.
b. Depress the fitting and detach tube # 96 from the regulator.

Related product manuals