EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 749

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Model 6DS-SP Planarizer
10 - 58 Version 4.0 - February 1998
Order Procedure
Location In
Maintenance Manual
A Robot Leveling Chapter 9 - Mechanical
Maintenance Procedures
B Robot Belt Tensioning Chapter 9 - Mechanical
Maintenance Procedures
1 Elevator Cassette Platform Leveling Chapter 9 - Mechanical
Maintenance Procedures
2 Elevator Cassette Arm Sensor Switch Adjustments Chapter 9- Mechanical
Maintenance Procedures
3 Robot Up/Down (Z-Axis) Top, Middle, and
Bottom Positions Calibration (Calibration
Variables: 116, 117, 118)
Chapter 10 - Software
Calibration Procedures
4 Elevator Height Positions Calibration (Calibration
Variables: 80, 81, 82, 83)
Chapter 10 - Software
Calibration Procedures
5 Robot Arm Rotation (Theta) Positions Calibration
(Calibration Variables: 76, 77, 78, 79)
Chapter 10 - Software
Calibration Procedures
6 Robot Arm Extension (Radial) and Travel (Linear)
Positions Calibration (Calibration Variables at
Elevators: 103 and 110, 104 and 111, 105 and 112,
106 and 113; Calibration Variables at Load
Stations: 107 and 114, 108 and 115)
Chapter 10 - Software
Calibration Procedures
7 Robot Up/Down (Z-Axis) Load Positions
Calibration (Calibration Variables: 130, 131, 132)
Chapter 10 - Software
Calibration Procedures
8 Robot Vacuum Switch Wafer Sensing Calibration Chapter 10 - Software
Calibration Procedures
9 Testing Elevator and Robot Calibration
Adjustments - Running a Short Cycle to Observe
Wafer Handling
Chapter 10 - Software
Calibration Procedures
Note:
Procedures A and B, Robot Leveling and Robot Belt Tensioning, are new with
Update 1/31/96 to the 6DS-SP Maintenance manual.

Related product manuals