EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 787

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Model 6DS-SP Planarizer
10 - 96 Version 4.0 - February 1998
B. CENTER THE LOAD STATIONS UNDER THE SPINDLES
Note: Lowering the spindles and applying a small amount of down force
centers the load stations automatically.
1. Load carriers on the spindles:
Follow the procedures detailed in the Operator Functions chapter of
the 6DS-SP Operations manual.
2. At Page 1 of the Manual Control Menu, select Bridge Move and choose
Load to move the bridge to the load stations.
3. At Page 2 of the Manual Control Menu, select Left Spindle Up/Down
and choose Down to move the left spindle down to the load station.
4. At Page 2 of the Manual Control Menu, select Right Spindle Up/Down
and choose Down to move the right spindle down to the load station.
5. At Page 2 of the Manual Control Menu, select Left Spindle Force and
enter 3 to change the force to 3 psi.
6. At Page 2 of the Manual Control Menu, select Right Spindle Force and
enter 3 to change the force to 3 psi.
7. Select Left Spindle Force and enter 0 to change the force back to 0 psi.
8. Select Right Spindle Force and enter 0 to change the force back to 0 psi.
9. Select Left Spindle Up/Down and choose Up to move the left spindle
back up.
10. Select Right Spindle Up/Down and choose Up to move the left spindle
back up.
11. At Page 1 of the Manual Control Menu, select Bridge Move and choose
Pol Tbl 1 to move the bridge to move the bridge back to polish position.

Related product manuals