EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 835

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Model 6DS-SP Planarizer
10 - 144 Version 4.0 - February 1998
Turn Machine Power On and Perform Home Sequence Routine
Follow the procedures detailed in the Operator Functions chapter of the 6DS-SP
Operations manual.
Install Polishing Pad on Table and Remove Carriers from Spindles
Follow procedures detailed in the Operator Functions chapter of the
6DS-SP Operations manual.
At the Machine Parameters Menu, Set Left and Right Force Scaling to 100%
Following procedures detailed in the Machine Setup chapter of the
6DS-SP Operations manual, at Page 1 of the Machine Parameters Menu, set
both Left Force Scaling and Right Force Scaling to 100%.
B. WEIGH CARRIERS AND ADJUST SENSOTEC INDICATOR
1. Weigh the Strasbaugh Load Cell Carrier and the two carriers you
removed earlier. Record the weights.
Example: Left Carrier Weight: 25.0 lbs.
Right Carrier Weight: 24.5 lbs.
Load Cell Carrier Weight: 8.0 lbs.
2. At Page 1 of the Manual Control Menu, select Bridge Move and choose
Pol Tbl 1 to move the bridge to polish position.
3. At Page 2 of the Manual Control Menu, select Left Spindle VAC
On/Off and choose On to turn vacuum on to the left spindle.
4. Open the Polish Area Right Side Operator Door.

Related product manuals