Strasbaugh Pneumatic Adjustments
Version 4.0 - February 1998 11 - 29
SPINDLES
SPINDLE MOVE DOWN SPEED
A. BEFORE YOU BEGIN
Tools Required
• flat blade screwdriver
• two to four test wafers
Turn Machine Power On and Perform Home Sequence Routine
Follow the procedures detailed in the Operator Functions chapter of the 6DS-SP
Operations manual.
Install Carriers on Spindles
Follow the procedures detailed in the Operator Functions chapter of the 6DS-SP
Operations manual.