15
WWW.STROMLTD.COM
STROM LIMITED
Maintenance should be carried out by a qualied heating and electrical
engineer on every part of the heating and hot water system every 12
months from date of installation.
Maintenance should only be carried out after carefully reading these
instructions, and the mains AC supply disconnected before maintenance
begins.
MAINTENANCE
• We recommend a cable size of between 1.0mm
2
and 1.5mm
2
must
be used.
• Where mounting to a metal surface, always ensure that the metal
is earthed.
• This product is not suitable for mounting on a back box.
INSTALLATION GUIDE