15 © STULZ USA – all rights reserved 11.8.22
CYBERWALL™ INSTALLATION, OPERATION AND MAINTENANCE MANUAL
CAUTION
When moving a module, it must be kept level and in the vertical position when lifting to prevent damage.
Figure 6. Lifting Detail
Field Assembly
CyberWall™ modules ship as separate shipping sections due to shipping and handling constraints. A field
assembly drawing is provided in the unit documentation pack if field assembly is required. Failure to explicitly
follow the field assembly drawing could cause damage or premature failure to the unit and void the unit’s
warranty. Installation must be performed by a qualified technicians.
Mounting/Placement
Slab Mount Installations
The unit is designed to be installed directly on a concrete floor or “housekeeping” pad. When determining
the installation location, consider how to route the piping and wiring to and from the cabinet. The installation
drawing furnished with your unit shows the piping and wiring locations. Ensure access is available for routing
the piping and wiring.