Installation Checklist
1. Proper clearances for service access have been maintained around equipment
2. Equipment is level and mounting fasteners are tight (if applicable)
3. Piping completed to coolant loop (if required)
4. All field installed piping leak tested
5. Condensate drain line connected and trap filled with water
6. Filter(s) installed
7. Incoming line voltage matches equipment nominal nameplated rating ± tolerances
8. Main power wiring connections tothe equipment, including earth ground, have been properly installed
9. Customer supplied main power circuit breaker (HACR type) or fuses have proper ratings for equipment
installed
10. All wiring connections are tight
11. Control wiring connections completed to optional equipment and devices including wiring to wall
mounted control panel, (if required)
12. Foreign materials have been removed from inside and around all installed equipment (shipping
materials, construction materials, tools, etc.)
13. Inspect all piping connections for leaks during initial operation