EasyManua.ls Logo

Stulz WDE Series - 5 Unpacking and Inspection

Stulz WDE Series
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WDE
33 © STULZ SpA . – all rights reserved EN/36B/08.2018
INFORMATION
For controller input / output assignation, please refer to the electric diagram on part 2 manual,
specific for each unit.
5. Unpacking and inspection
INSPECTION
STULZ products are delivered ex-works. All units have been individually inspected in all their
components and been carefully packaged before the delivery.
Immediately inspect the unit upon receipt of the goods.
Make sure that it has been transported in the correct position. Note any unsuitable shipping
conditions on the shipping document.
Check that no components are missing, that are presents on shipping document and the integrity
of the conditioner at the moment of the receiving.
Check that there aren’t any external damages. In case of damages, note them on the shipping
document in the presence of deliverer.
Hidden damage, that are verified after removal the packing, must always be notified to the shipper
by registered letter within 8 days of receipt of the goods.

Related product manuals