Integ rated Installation 21
Insta llation Checklist
T
o ensure a safe and proper install ation, the following
checklist should be completed by the installer t o ensure
that no part of t he installation has been overlooked.
INSTALLATION CHEC KLIST
Have all packing materials been removed?
Turn the unit on. Is i t operating properly?
Is the power cord plug ged into a properly grounded
outlet, which has been installed in accordance with all
applicable electrical codes?
For units with an automatic ice maker, is the water
supply line connected and not leaking? Is the wate r
supply turned on and ice maker control on?
Has the anti-tip bracket been installed securely and
properly engagin g the unit?
Is the unit lev eled properly with all leveling legs makin g
contact with the floor? Has the kickplate/grille been
installed?
Are panels attache d securely and prop erly aligned?
Has the door been aligned for proper appearance and
operation?
Does the customer understand the unit's operat ion?
Does the customer have the warranty package?
Have any installation or service problems been noted
on the product registration ca rd? Has t he regi stration
card been mailed in?
Have stainl ess steel panels been inspected for a ny
imperfect ions? This is to be done by the authorize d
Sub-Zero dealer or i nstaller with the customer, upon
completio n of installation. Stainless stee l panels are
covered by a limited 60-day warranty for cosmetic
defects.
subzero .com/specs