Do you have a question about the Sukup U-Trough Power Sweep and is the answer not in the manual?
Important notice regarding performance variation based on grain condition and bin floor.
Warranty for Sukup equipment against defects in material and workmanship.
Details items and conditions not covered by Sukup's warranty.
Specific extended warranty periods for stirring machines, augers, fans, and heaters.
Outlines warranty coverage and procedures for electric motors.
States that Sukup's warranty obligations terminate if unapproved parts are used or modifications are made.
Explains safety signal words, importance of decals, and general safety rules.
Critical warnings about entering bins and hazards of rotating augers and flowing grain.
Emphasizes proper wiring, grounding, and lockout procedures for safe servicing.
Highlights owner responsibility for site-specific PPE standards and OSHA guidelines.
Instructions for having emergency numbers and work site directions readily available.
Details specific safety decals, their meanings, and recommended placement on equipment.
Provides overall dimensions for the U-Trough Power Sweep with extended center sump.
Details dimensions for horizontal powerheads based on bin diameter.
Provides specific dimensions for the 20° incline powerhead.
Discusses requirements for concrete trenches and aeration floors for installation.
Details steps for installing the U-Trough in a concrete trench, including positioning.
Notes for installing in a bin with a full aeration floor, including plenum height and floor thickness.
Instructions for aligning and mounting bin collar sections to the bin and U-Trough.
Steps for removing and reinstalling the top gearbox, particularly for bins without walk-through doors.
Guidance on installing floor flashing correctly for sweep operation.
Procedures for fastening sump flanges to the bin floor.
Details on attaching the sweep input shaft to the gearbox and mounting the backboard.
Steps for attaching the gearbox assembly, drive wheel, and reclaim shield.
Instructions for attaching extension plates and mounting carrier wheels for support.
Procedures for bolting the sweep stop and its extension to the bin wall.
Steps for attaching scrapers to the backboard, ensuring proper clearance and alignment.
Covers removing shields, mounting the powerhead, and attaching the motor.
Steps for mounting pulleys, aligning them, and installing drive belts.
Details on removing the unload auger shaft and connecting the incline to the U-Trough.
Instructions for attaching support chains to the incline and securing them to the bin.
Steps for mounting the motor and pulleys for the incline powerhead configuration.
Procedures for connecting the extension auger drive shaft and trough to the main unit.
Guidance on supporting the U-Trough extension and installing the powerhead.
Instructions for measuring belt span and determining proper deflection using a force gauge.
Using tables to find correct deflection settings and checking belt tension periodically.
Steps for preparing the bin wall and mounting the conduit for the cluster buster.
Procedures for inserting and routing the cable through the bin and torsion bar.
Guidance on using the alignment rod and storing the cluster buster components.
Verifying bin and foundation suitability and checking for cluster buster components.
Procedures for opening sumps and unloading grain, monitoring motor current.
Steps for engaging the sweep auger and operating it safely, including warnings about near-empty bins.
Diagnosing and resolving problems with the sweep not moving around the bin.
Troubleshooting drive chain breakage and connector link problems.
Instructions for checking and adding gear oil to gearboxes and grease to bearings.
Exploded view illustrating the main parts of the complete U-Trough assembly.
Detailed list of all parts for the complete U-Trough, including reference numbers and part numbers.
Exploded view showing the components of the U-Trough body assembly.
Comprehensive list of parts for the U-Trough body assembly.
Exploded view of the U-Trough Power Sweep Drive Housing assembly.
Detailed list of parts for the U-Trough Power Sweep Drive Housing.
Exploded view illustrating the parts of the backboard assembly.
List of parts specific to the Lower Gearbox (EU0808).
Exploded view showing the components of the Top Gearbox assembly.
List of parts for the 16-to-1 Reduction Drive Wheel Gearbox.
List of parts for the 16:1 Drive Wheel and Reclaim Shield assembly.
List of parts for the U-Trough Horizontal Powerhead (EU1170).
Exploded view illustrating the parts of the U-Trough 20° Incline Powerhead (EU1180).
List of parts for the U-Trough 20° Incline Powerhead (EU1180).
List of parts for the Rear Carrier Wheel assembly.
List of parts for the Unload Auger Outer Section.
List of parts for the Clutch Shifter Arm Assembly (EU0906).
List of parts for the Top Gearbox Bearing Assembly (EU1262).
List of parts for the Sweep Auger Support Bushing.
Reference list of optional farm-duty motors with specifications and part numbers.
Table listing motor pulleys by diameter, bore, groove type, and part number.
Table providing part numbers for split taper bushings based on bore size.
Section to record Sukup dealer contact details for support and inquiries.
Space to record emergency contact numbers and work site information for immediate assistance.
| Model | U-Trough Power Sweep |
|---|---|
| Manufacturer | Sukup |
| Category | Farm Equipment |
| Capacity | 10, 000 to 60, 000 bushels per hour |
| Sweep Width | Varies by model |
| Power Source | Electric |
| Material | Steel |
| Application | Grain Handling |
Loading...