EasyManua.ls Logo

Sullair VS16 30HP Series - Section 4 INSTALLATION; Section 5 OPERATION; Section 6 MAINTENANCE

Sullair VS16 30HP Series
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TABLE OF CONTENTS
Section 3
SPECIFICATIONS
28 Figure 3-3B Piping and Instrumentation - 30-40HP/ 22-30KW
(continued) Water-cooled
32 Figure 3-3C Piping and Instrumentation - 50HP/ 37KW
Air-cooled
36 Figure 3-3D Piping and Instrumentation - 50HP/ 37KW
Water-cooled
Section 4
INSTALLATION
41 4.1 MOUNTING OF VACUUM SYSTEM
41 4.2 VENTILATION AND COOLING
41 4.3 VACUUM SYSTEM PIPING
41 4.4 COUPLING ALIGNMENT CHECK
41 4.5 FLUID LEVEL CHECK
42 4.6 MOTOR ROTATION DIRECTION CHECK
42 4.7 ELECTRICAL PREPARATION
42 4.8 RUPTURE DISK
Section 5
OPERATION
43
5.1 GENERAL
43 5.2 PURPOSE OF CONTROLS
44 5.3 INITIAL START-UP PROCEDURE
44 5.4 SUBSEQUENT START-UP PROCEDURE
44 5.5 SHUTDOWN PROCEDURE
45 5.6 AUTOMATIC RE-START OPTION
Section 6
MAINTENANCE
47
6.1 GENERAL
47 6.2 DAILY OPERATION
47 6.3 MAINTENANCE AFTER INITIAL 50 HOURS
OF OPERATION
47 6.4 MAINTENANCE EVERY 4000 HOURS
47 6.5 MOTOR BEARINGS
47 6.6 FLUID FILTER MAINTENANCE
47 6.7 PARTS REPLACEMENT AND ADJUSTMENT
PROCEDURES
47 FLUID FILTER ELEMENT REPLACEMENT
48 INLET AIR FILTER MAINTENANCE
48 SEPARATOR ELEMENT REPLACEMENT -
30-40HP / 22-30KW
49 SEPARATOR ELEMENT REPLACEMENT - 50HP / 37KW
Continued on next page

Table of Contents

Related product manuals