EasyManuals Logo

Sungrow SG1100UD-MV User Manual

Sungrow SG1100UD-MV
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #55 background imageLoading...
Page #55 background image
47
7.2.6 Removing Foam Part from Oil Thermometer
Remove the protective cover on the oil thermometer and remove the foam parts in the pro-
tective cover before the inverter is officially put into operation.
After removal, re-install the protective cover.
7.2.7 Draining Oil from Transformer
If the transformer is transported with a full oil tank, drain some oil from the transformer after
the product is transported to the site.
No. Device Source
1 Clean hoses and oil tank
Not included in the scope of supply
2 Cleaning cloth
3 Wrench
4 Adjustable wrench
5 Hose connector
6 Pipe clamp
step 1 Ensure that the drain valve is closed.
step 2 Remove the cover plate of the drain valve.
step 3 Remove the cover plate of the drain valve.
System Manual 7 Powering up and Powering down

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SG1100UD-MV and is the answer not in the manual?

Sungrow SG1100UD-MV Specifications

General IconGeneral
Max. DC Voltage1500 V
MPPT Voltage Range500 V - 1500 V
Max Efficiency99%
Power Factor0.8 leading - 0.8 lagging
Protection ClassClass I

Related product manuals