EasyManuals Logo

Sungrow SG20KTL-M Quick Guide

Sungrow SG20KTL-M
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #7 background imageLoading...
Page #7 background image
TD_202101_Logger1000_Quick Guide for 3-Phase PV Inverters (5-20kW)_V1.2 Page 7 of 16
© Sungrow Power Supply Co., Ltd. All rights reserved.
As we continuously improving our services, changes to this document may occur without notice.
2.3 Connection to Logger1000
Connect the RS485 comms from the inverter(s) via A1/B1 and the energy meter via
A2/B2 (can be connect to A3/B3 if A2/B2 is occupied by inverters) to the Logger1000
as an example.
On the logger1000 side, A1 and B1 are terminals to connect with the inverter which
display as COM1 on the Logger1000 web portal; A2 and B2 are the terminals to
connect with the energy meter, they are shown as COM2 on the portal.

Other manuals for Sungrow SG20KTL-M

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SG20KTL-M and is the answer not in the manual?

Sungrow SG20KTL-M Specifications

General IconGeneral
BrandSungrow
ModelSG20KTL-M
CategoryInverter
LanguageEnglish

Related product manuals