EasyManua.ls Logo

Sunny PERFORMANCE INTERACTIVE SF-RBE420035 - Battery Management; Battery Installation; Battery Replacement; Battery Disposal Guidelines

Sunny PERFORMANCE INTERACTIVE SF-RBE420035
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
BATTERY INSTALLATION & REPLACEMENT
BATTERY INSTALLATION
1. Take out 2 AAA batteries from meter box.
2. Press the buckle of battery cover on the Meter (No. 14), then remove battery cover.
3. Install 2 AAA batteries into the battery case on the back of the Meter (No. 14). Pay attention to
the battery + and poles before installing.
4. Press the buckle of battery cover, then put the battery cover back to the back of the Meter (No.
14).
The installation is complete!
BATTERY REPLACEMENT
1. Press the buckle of battery cover on the back of the Meter (No. 14), then remove battery cover.
2. Remove the 2 old AAA batteries in the battery case and install 2 new AAA batteries into the
battery case on the back of the Meter (No. 14). Pay attention to the battery + and poles before
installing.
3. Press the buckle of battery cover, then put the battery cover back to the back of the Meter (No.
14).
The replacement is complete!
BATTERY DISPOSAL
Dispose the batteries according to the laws and regulations of your local region. Some batteries
may be recycled. When disposing or recycling, do not mix battery types.
Battery
Cover
Battery
14

Related product manuals