EasyManua.ls Logo

Sunstream SWIFTSHIELD A Series - Bow Sprit Installation

Default Icon
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FORM NO. 660769 REV. C PAGE 33
2-Q
Bow Sprit Installation
Steps:
1. With boat raised, in the standard position on SunLift™.
2. Insert spreader pipe through hole in end of bow sprit extension tube, hold in place with
cotter pins.
3. Apply anti-seize to all bolt threads before installing nuts.
4. Position bow sprit in the center of SunLift™ front cross beam. Clamp in place with nuts
and bolts.
5. Insert bow sprit extension tube into welded tube.
6. Extend bow sprit to be between 0” - 12” in front of bow, directly below roller.
7. Lock in place with 3/8-16 x 3.5” bolt and nut.
8. Properly torque all nuts on bow sprit.
Spreader Pipe
Cross Beam
5.
Bolt SS,
3/8-16 x 3”
2 Places
Nut SS, Nylok
3/8-16
2 Places
Bow Sprit
Extension Tube
12”-14”
7.
* Hydraulic hoses not shown.
Welded Tube