EasyManua.ls Logo

Suzuki DF 50 - Page 252

Suzuki DF 50
405 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LOWER UNIT 9-18
PROPELLER SHAFT / BEARING HOUSING
Assemble the propeller shaft in the following sequence :
forward thrust washer 5, reverse thrust washer 1, reverse gear
2, reverse gear back-up shim 3 and propeller shaft housing
4.
99000-25160 : Water Resistant Grease
99000-22540 : Suzuki Outboard Motor Gear Oil
Using special tools, install the propeller shaft and housing as-
sembly in the gear case.
09922-59410 : Propeller shaft housing installer
09922-59420 : Housing Installer Handle
When the housing is fully seated, tighten both retaining bolts to
the specified torque.
Bearing housing bolt : 17 N
.
m (1.7 kg-m, 12.3 lb.-ft.)
RECHECKING DRIVESHAFT THRUST PLAY
Recheck the driveshaft thrust play.
This should not be less than previously checked. If less, reduce
the number / thickness of reverse gear back-up shims.
09951-09510 : Gear adjusting gauge
l
j
z
@
z
l
z
@

Table of Contents