EasyManua.ls Logo

Synrad Firestar f201 - Control Connections

Default Icon
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 QSG f201 version 2.1
Firestar™ f201 laser & Flyer 3D System Quick Start Guide
a Novanta company
a Novanta company
17. Connect the lasers control User interface connector to the laser. For initial setup and testing, use the
Quick Start Plug. Use the Quick Start Plug only for initial testing or when troubleshooting. Remove DC
power before installing or removing the Quick Start Plug. Please refer to the Getting Started (Connect-
ing laser connections & the following Quick Start Plug) sections in the lasers Operators Manual.
BNC
Connector
17.2 Control connection locations (for the Marking Head). Note: the ferrite bead is closest to
the Flyer 3D Marking Head. (Refer to step 18.)
18. Connect the Marking Head’s laser control connector to the (laser control) interface. The ferrite bead,
should be located at the end of the cable, closest to the Flyer 3D.
17.1 Quick Start Plug (QSP) goes here, the BNC cable plugs into
the QSP.
Quick
Start Plug
Control Connections:
Caution:
The Quick Start Plug bypasses the laser’s safety interlock function, potentially
exposing personnel to hazardous invisible laser radiation.

Other manuals for Synrad Firestar f201

Related product manuals